Zephyr CACHE CCA-E30ASX Use Instalační příručka Strana 16

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 22
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 15
14
www.zephyronline.com
Installation – External Blower Preparation
3. Place cap over threaded cable lock and secure
by turning cap clockwise. NOTE: Due to the
size of the cap, it may be easier to install it
after the hood has been mounted.
4. Connect 6 pin male connector from external
blower wiring to 6 pin female connector on
control board box. Attach green ground wire
from external wiring to ground screw on hood.
EXTERNAL BLOWER PREPARATION
 3ODFH´URXQGPRXQWLQJSODWHRQWRSRIKRRG
and secure using eight M4*8 screws.
2. Install threaded cable lock and external
blower wiring through the knockout next to
the electrical wiring knockout.
NOTE: For instructions on mounting the external blower please refer to the CBE-1000 external blower manual
included in the external blower packaging or on our website. www.zephyronline.com
Zobrazit stránku 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22

Komentáře k této Příručce

Žádné komentáře