Zephyr CACHE CCA-E30ASX Use Instalační příručka Strana 14

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 22
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 13
12
www.zephyronline.com
Installation – Internal Blower (Horizontal Ducting)
1. Attach capacitor box to inside of hood using two
M4*10 screws included with internal blower.
2. Attach green ground wire to ground screw on
hood.
3. Connect 6 pin male connector from capacitor
box to 6 pin female connector on control board
box.
4. Place solid mounting plate on top of hood and
secure using eight M4*8 screws.
5. Remove rectangular cap from back of hood.
Place six M4*8 screws aside for later use.
6. Attach blower brackets to blower as shown above
using two M3.5*10 screws for each bracket.
There are two brackets total, one for each side of
WKHEORZHU127('ULOOHGÀDQJHRIERWKEORZHU
brackets faces away from the blower casing.
INTERNAL BLOWER PREPARATION – HORIZONTAL DUCTING
Zobrazit stránku 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Komentáře k této Příručce

Žádné komentáře