Zephyr CACHE CCA-E48ASX Use Instalační příručka Strana 16

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 23
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 15
14
www.zephyronline.com
Installation – External Blower Preparation
3. Place cap over threaded cable lock and secure
by turning cap clockwise. NOTE: Due to the
size of the cap, it may be easier to install it
after the hood has been mounted.
4. Connect 6 pin male connector from external
blower wiring to 6 pin female connector on
control board box. Attach green ground wire
from external wiring to ground screw on hood.
EXTERNAL BLOWER PREPARATION
1. Place 8” round mounting plate on top of hood
and secure using eight M4*8 screws.
2. Install threaded cable lock and external
blower wiring through the knockout next to
the electrical wiring knockout.
NOTE: For instructions on mounting the external blower please refer to the CBE-1000 external blower manual
included in the external blower packaging or on our website. www.zephyronline.com
Zobrazit stránku 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 22 23

Komentáře k této Příručce

Žádné komentáře